ROOF/TRUSS ATTIC AREA

1. Bottom Chord Truss strapping installed (within required spacing)
2. Truss Cross Bracing installed per engineering.
3. Roof girders installed correctly.
4. Point loads from girder trusses transferred correctly
5. Insulation stops installed tight to sheathing
6. 1x4 rat runs/ lateral support installed
7. Roof vent holes cut – 1 per 250 sq ft attic space
8. Roof access framed if required
9. Inside of truss sheeted from interior to exterior for insulation
10. HVAC roof penetrations marked / framed
11. Gable truss seams blocked (ZLL)

Second Floor Walls

12. Walls level, square, and straight
13. No bowed studs
14. Point loads carried from above
15. Stub wall height secure/level
16. Mechanical walls straight and secure
17. Dead spaces closed off

Second Floor Doors / Windows

18. Bedroom doors rough opening correct (Add 2.5” to plan height, and 2” to plan width )
19. Closet doors rough opening correct (Add 2” to plan height and 2” to plan width)
20. Window headers installed per structural drawings
21. Windows centered and straight
22. Windows properly shimmed
23. No gaps at window frames

Second Floor Bathroom

24. Shower / tub corners straight and level
25. Tub tight to wall (no gaps)
26. IPD installed behind tubs where required
27. Vanity Backing 36”
28. Toilet paper holder backing 2’ o.c
29. Towel Bar Backing 48” AFF
30. Plumbing Walls installed as per plan

Second Floor Backing / Blocking

31. Backing installed at all corners
32. Backing installed at top of walls
33. Directional blocking installed between joist spaces
34. Closet shelf backing 66" AFF
35. TV Backing-- approx 60" AFF (2×10)

Second Floor STAIRS (UPPER)

36. Stairs level side-to-side and front-to-back
37. Handrail backing 34–36" AFF
38. Winder backing installed where required
39. Winder landing posts secured
40. Drywall backing under stairs
41. Beams installed in correct locations
42. Beam hangers installed glued and nailed
43. Joist installed as per layout
44. Joist hangers installed, glued and nailed

MAIN FLOOR

45. Second floor joist layout correct
46. Beams installed correctly
47. Point loads transferring to foundation
48. Tall Wall strapped/ bolted at concrete foundation as required.

Kitchen

49. Cabinet backing installed (lower and upper) 36” lower and 7’ for upper if ceiling is 8’—8’ for upper if ceiling is 9’
50. Stud spacing behind cabinets 16"
51. Fridge recess framed correctly
52. Plumbing wall framed/installed correctly

Living / Dining

53. Fireplace framed to plan dimensions
54. TV backing installed approx 60" AFF (2×10)
55. Walls level and straight
56. Bowed studs replaced

Doors / Windows

57. Interior doors rough openings correct (add 2.5” to plan height, 2” to plan width)
58. Exterior doors centered, shimmed, and screwed
59. Windows centered and level

Floors

60. Floors glued and screwed
61. No holes no squeaks in floors

BULKHEADS / MECHANICAL

62. Mechanical bulkheads framed correctly
63. Plumbing walls secure
64. Mechanical walls straight

GARAGE

65. Overhead door backing installed
66. Garage door opener backing installed
67. Tall wall blocking installed
68. Garage attic framing correct
69. Joist layout correct above garage
69a. Anchor bolts through bottom plates 1/2" diameter 4" minimum embed. 12-18" from each plate end with max 8' spacing.

EXTERIOR

70. Front entrance roof posts nailed properly
71. Fascia Straight and True
72. Lower Roofs Level
73. Meter mast framing correct
74. Tyvek installed properly
75. Fire separation blocks at soffits
76. Seam blocked on gable end trusses or drywall stops - installed with little gapping or seal smoke truss
77. Fire separation line adequate for wall intersections
78. Drywall holes properly backed/patched
79. Window nailing and straightness checked
80. Deck nailer installed
81. Winder/Landing has fire separation or space to be completed with no nails protruding

FINAL SITE

82. Main building clean and free of debris
83. Materials stacked safely
Drag & Drop Files, Choose Files to Upload

Basement

1. Main floor joist print reviewed
2. Teleposts installed, screwed and aligned
3. Point loads transferred correctly
4. Hangers installed correctly
5. Stairs level side-to-side and front-to-back
6. Handrail backing 34–36" AFF
7. Winder backing installed where required
8. Winder landing posts secured
9. Drywall backing under stairs
10. Basement windows centered in openings
11. Windows level and straight
12. Windows properly shimmed
13. No gaps around windows
14. Walls level, square, and straight
15. No bowed studs
16. Bedroom doors rough openings correct (add 2.5” to plan height, 2” to plan width)
17. Closet doors rough openings correct (add 2” to plan height, 2” to plan width)
18. Bathroom walls level and straight
19. Shower/tub corners straight and level
20. Tub tight to wall (no gaps
21. Plumbing walls framed correctly
22. Towel bar backing 48" AFF
23. Toilet paper holder backing 2' O.C.
24. Vanity Backing 36” AFF
25. Backing installed at all corners
26. Backing installed at top of walls
26. Backing installed for cabinets (suited basement) Cabinet backing installed (lower and upper) 36” lower and 7’ for upper if ceiling is 8’—8’ for upper if ceiling is 9’
27. Mechanical bulkheads framed correctly
28. Plumbing walls secure
29. Dropped ceilings framed where required